Project Fact Sheet
| Project Name: |
Oryx Kazakhstan Energy |
| Owner: |
Oryx Energy Company (Kerr McGee) |
| Reference: |
Mr. Steve Limke, Project Manager,
Phone: 1-972-715-4776 |
| Location: |
Kazakhstan Territorial Waters, Caspian Sea |
| Contract Scope: |
General Contractor - Construct the first artificial island in the Caspian Sea
suitable for support of drilling rig and associated operations. |
| Capital Cost: |
Approximately $12 Million |
| Contract Type: |
Reimbursable |
| Project Duration: |
November 1996 to April 1998 |
Arctic Construction worked together with the oil company and engineering company to plan, design and
implement this project. As General Contractor, ACI provided all earth moving, and marine equipment,
including a sea dredge and pile driving equipment for construction. In addition ACI provided camp and
support equipment as well as on shore logistical support.
|
|
|
| |