Project Fact Sheet
| Project Name: |
Parmaneft Project |
| Owner: |
Occidental International Exploration |
| Reference: |
Mr Don Neet, Manager Construction,
Phone: (206) 275-9421 |
| Location: |
Pechora, Komi Republic, Russia |
| Contract Scope: |
Construct road and drill pads and provide infrastructure to
support drilling operations |
| Capital Cost: |
Approximately $10 Million |
| Contract Type: |
Self-Financed Reimbursable |
| Project Duration: |
1993 to 1995 |
Arctic Siberia Limited assembled and shipped approximately $10,000,000.00 of construction,
transportation and camp equipment in August 1993 to support its contract with Occidental/Parmaneft. The
equipment arrived in Archangel on September 7th, 1994 and was then shipped by rail and barge to Pechora,
Komi Republic to commence construction of 10 km high grade road. After completion of the road, additional
facilities were constructed to support the drilling operations, a base camp, pipe storage yard, helicopter pad
as well as two additional drill pads for ongoing operations. Transportation equipment and cranes were also in
use at the drill sites in support of operations.
|
|
|
| |
Web design in Vancouver by Graphically Speaking.
|
|
|
|